salient domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/plaidint/public_html/onwarepast/wp-includes/functions.php on line 6131Visualize your project documents real-time progression quickly with an overview of details, including:
• One-click document access
• Status signifying the documents workflow stage
• Color coded aging to monitor how many days the document has been in progress
• Waiting for and Responded columns reflecting who is still outstanding and who has responded
• PDF Printable
Maintain standards on turn-around times across all projects you manage. Choose to receive a summary report delivered directly to your inbox on a recurring scheduled basis.
You control what data displays on document reports, using filters conveniently located on the document’s search page. Each document type in Onware provides, at minimum, two types of reports:
1. Summary version formatted for printing
2. Csv file for use in your favorite spreadsheet program
Summary version reports typically include information such as:
• Document number, title and status
• Document date details, such as: Issued, reviewed, approved, required by dates
• Automated calculation results, such as: Average response time, Total value of Changes to date, Revised Contract value
Identify key trends, decrease project risk and reduce profit erosion with complete transparency into your portfolio and individual projects. Bringing all your project data together into a single place with third-party Business Intelligence tools, such as Tableau and Power BI, so you can compare performance and project data in your own way.
To help Project Administrators, instructions are now available when editing a setting in version 9.27.0.

In version 9.27.0, when “copy” is used, all fields will be copied except Meeting Type. User should select the Meeting Type which will copy all outstanding Meeting Items to the new Meeting.
Contract Administrator can now enter a Quotation on behalf of a General Contractor when pricing is required on a Change Directive.

When “Enter on Behalf of Contractor” is selected, Contract Administrator will be directed to the Quotations page and will be required to select the General Contractor the Quotation is being entered on behalf of in the “Issued By” field as well as the date is was “Issued On”.

Onware continues to innovate and implement functionality to enhance your project experience. Receiving and storing project e-mails with Onware is the first of many new and exciting e-mail features on our software development roadmap.
How to use Onware’s project e-mail is quick and easy! Simply include the project’s unique e-mail address in any project e-mail communication. Whether forwarding an existing e-mail from your inbox, or include the project’s e-mail address as a “To” or “Cc” recipient when sent, Onware does the rest!
Configure your Onware Cloud project with a unique e-mail address to have Onware automatically capture, store and record incoming e-mails along side all your other project documents in Onware’s centralized and secure location. Visit our User Guide for steps to configure and how to view project e-mails.
The consolidated action link dropdown is now standard on all document types. Actions available will be dependent on user’s access and status of the document. Previously, Package and E-mail Package functionality was available only on certain documents. All feedback on these two new features has been positive and we are happy to announce in version 9.24.0, we have these features across all documents.

When “E-mail Package” is selected, a confirmation message will display letting you know that your request is being processed.

A threshold has been identified when the number of documents for a Change Order package is too large and the package will be unsuccessful in generating. When this threshold is exceeded, a warning message will now display and the package will not be available.
Prior to 9.24.0, “New Item” displayed as a pop-up window. Based on user feedback, we have re-designed this function with a more mobile-friendly layout. Users can now add a New Item in “form to expand” layout. While the layout has been adjusted, all fields previously available are still available. In addition, when creating a new area, a warning message will now display if it is identified an existing area matching the Number and Name of the new area already exists.

To help identify which Site Visit document the Item originated, the Site Visit Number will be displayed for every item. In addition, the Items on the Site Visit has also been replaced with an inline grid display. To edit, simply double-click on the Site Visit Item within the inline editor grid.


Contract Administrator can now choose which status the Site Visit should transition, based on the projects requirements.

Prior to 9.24.0, the only date range available for refining your search was the date the Change was issued for Pricing. We have updated the date filter criteria to provide more flexibility and can now be used to search dates of “Issued”, “Issued for Pricing”, and “Re-Issued for Pricing”.
