Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the salient domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/plaidint/public_html/onwarepast/wp-includes/functions.php on line 6131
Onware for the General Contractor – Onware
Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home2/plaidint/public_html/onwarepast/wp-includes/functions.php on line 6131

Onware now includes Sub-Contractor workflows.  Access to the Sub-Contractor workflows, through the Navigation Menu, display for the Sub-Contractor and General Contractor roles within Onware.  Click on a Sub-Contractor workflow for highlights and more information.

  • Sub-Contractor Request for Information
  • Sub-Contractor Request for Change
  • CRX
  • Sub-Contractor Quotation
  • Sub-Contractor Change Order

To accommodate the Sub-Contractor workflows, additional Settings and Project Edit information has been implemented.

Settings

Person Trades

  • List of Trades available for selection in a person’s Preferences
  • Customizable on a per project basis to accommodate project specific trades

CRX

  • Codes for labor, material and sub-contractor cost lines

Project Edit

Trades

  • If project specific trades are required, these can be customized (in the setting) and set for each individual, as necessary

CRX codes

  • Ability to create project specific codes for Labour, Materials/Equipment/Transport or Sub-Contractor costs
  • Ability to add default codes set in Onware

Companies

  • Ability to identify the General Contractor company for the project

Rates

  • Copies the rate entered into the CRX and calculates based on the rate provided

Contracts

  • Addition of a Sub-Contractor Contract type

Sub-Contractor Request for Information

The Sub-Contractor RFI document allows a Sub-Contractor to issue a question to the General Contractor.  If the General Contractor can answer the question, they will return the Sub-Contractor RFI to the Sub-Contractor.  If, however, the General Contractor cannot answer the question, the Sub-Contractor RFI document can be used to generate an RFI to submit to the requested Sub-Consultant disciplines for a response.

scrfi

Sub-Contractor Request for Change

A Sub-Contractor can issue a Sub-Contractor Request for Change to the General Contractor.  Once submitted, the General Contractor has the ability to use the Sub-Contractor Request for Change document to create a CRX.

A Sub-Contractor can only access (view/pdf) their own Sub-Contractor Request for Changes.

scrfc

CRX

A CRX is the mechanism used by the General Contractor to request pricing from a Sub-Contractor.  If pricing is requested, the Sub-Contractor will utilize the Sub-Contractor Quotation to submit pricing.  If the General Contractor deems the pricing acceptable, the CRX can be used to generate a Unsolicited Change Request or initiate a Sub-Contractor Change Order.

A Sub-Contractor can only access (view/pdf) their own Sub-Contractor Quotations and must have a Trade identified in either their Preferences or within the Project to be able to provide pricing on a CRX.

sccrx

Sub-Contractor Change Order

A Sub-Contractor Change Order, initiated from the Sub-Contractor Quotation on a CRX, allows a General Contractor to issue and the Sub-Contractor to Acknowledge it.

A Sub-Contractor can only access (view/pdf) their own Sub-Contractor Change Orders.

scco