Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the salient domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/plaidint/public_html/onwarepast/wp-includes/functions.php on line 6131
Enter a Sub-Contractor Quotation on behalf of the Sub-Contractor (Trade) – Onware
Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home2/plaidint/public_html/onwarepast/wp-includes/functions.php on line 6131

Need to enter a Sub-Contractor’s Quotation on their behalf?  You now can by following the steps below:

  1. From the Navigation Menu, select the appropriate project.
  2. Select Changes > CRX.
  3. 2016-02-10_14-59-40Select “New” to create a new CRX OR edit an existing CRX.
  4. From within the CRX, select the check box of Sub-Contractor to enter a Quotation on behalf of.
  5. 2016-02-10_15-02-05Select Save from the Top Toolbar.
  6. An “Enter on Behalf” of button appears next to the Sub-Contractors name selected.
  7. Select the “Enter on Behalf” of button.  The Sub-Contractor Quotation page displays.
  8. Complete all necessary fields.
    NOTE: Total Quoted and Cost Type are mandatory fields.  If a Sub-Contractor Change Order will be required, a Contract must be selected (or created using the New Contract) button.
  9. By default, the Issued By field populates with the Sub-Contractor’s name selected in step 4 above.  This can be removed and amended as required.
  10. Select the appropriate action from the Top Toolbar:
    1. Close
      1. A contract must be selected prior to the Sub-Contractor Quotation Close action being accepted by Onware.
      2. Closing allows a Sub-Contractor Change Order to be created.
    2. Close Without Contract
      1. Does not require a Contract prior to Closing the Sub-Contractor Quotation.
      2. A Sub-Contractor Change Order will not be able to be issued from with Sub-Contractor Quotation.
  11. Once the Sub-Contractor Quotation is closed, you are re-directed to the CRX selected in Step 3 above.

NOTE: The Sub-Contractor must have a Trade selected in either their Preferences (User Account) or the Project for a Sub-Contractor Quotation to be created on their behalf.

Want to learn about all the exciting changes in version 8.21.1 of Onware?  Click here!